Field Notes
MMC Notes from the Field #02: Approval must be designed, not discovered
MMC slows down when teams assume approval can be worked out later. If the inspection pathway is not aligned before production, the project carries system risk before it leaves the factory.
MMC Notes from the Field #01: Factory-ready is not site-ready
A factory can be ready to ship. That does not mean the site is ready to receive. In MMC, speed is created when the site is prepared to accept certainty.